2024-03-29T14:52:41Z
https://nagoya.repo.nii.ac.jp/oai
oai:nagoya.repo.nii.ac.jp:00007542
2023-01-16T03:53:02Z
320:321:322
Job Shop Scheduling Focusing on Role of Buffer
バッファを考慮にいれたジョブショップスケジューリング
樋野, 励
21231
HINO, Rei
21232
楠見, 哲也
21233
KUSUMI, Tetsuya
21234
柳, 在圭
21235
YOO, Jae-Kyu
21236
清水, 良明
21237
SHIMIZU, Yoshiaki
21238
Buffer Capacity
Scheduling
WIP(Work in Process)
Bottle Neck
A scheduling problem is formulated in order to consistently manage every production resource such as machine tool, assembly robot, AGV, storehouse, material shelf, and so on. The production resources are classified into three devices, which are producer, location, and mover. This paper especially focuses on a role of buffer, and the differences among these devices are analyzed. A unified scheduling formulation is derived from the results of the analysis based on the role of the devices. Scheduling procedures based on dispatching rules are also proposed in order to numerically evaluate job shop type production with finite buffer capacity. The influence of capacity of bottle necked production devices and the buffer on the productivity are discussed.
journal article
日本機械学会
2005-02
application/pdf
日本機械学會論文集 C編
702
71
685
692
http://hdl.handle.net/2237/9232
0387-5024
https://nagoya.repo.nii.ac.jp/record/7542/files/JsMecEng_C_71-702-685.pdf
jpn
http://ci.nii.ac.jp/naid/110006264583/
日本機械学会
本文データは学協会の許諾に基づきCiNiiから複製したものである。