ログイン
言語:

WEKO3

  • トップ
  • ランキング
To
lat lon distance
To

Field does not validate



インデックスリンク

インデックスツリー

メールアドレスを入力してください。

WEKO

One fine body…

WEKO

One fine body…

アイテム

{"_buckets": {"deposit": "baff9216-e713-4a3c-9e3b-72acc5e199a1"}, "_deposit": {"id": "10289", "owners": [], "pid": {"revision_id": 0, "type": "depid", "value": "10289"}, "status": "published"}, "_oai": {"id": "oai:nagoya.repo.nii.ac.jp:00010289", "sets": ["1126"]}, "author_link": ["31200", "31201"], "item_10_biblio_info_6": {"attribute_name": "書誌情報", "attribute_value_mlt": [{"bibliographicIssueDates": {"bibliographicIssueDate": "2008-12", "bibliographicIssueDateType": "Issued"}, "bibliographicPageEnd": "2438", "bibliographicPageStart": "2431", "bibliographic_titles": [{"bibliographic_title": "Winter Simulation Conference (WSC 2008)", "bibliographic_titleLang": "en"}]}]}, "item_10_description_4": {"attribute_name": "抄録", "attribute_value_mlt": [{"subitem_description": "The use of the Operation Process Simulation (OPS) for Six Sigma Projects (SSP) can illustrate visual display of the process by enabling to define, measure, analyze and improve the current process virtually but realistically. This paper investigates the quantitative benefits of using the Design for Six Sigma (DFSS) technique for a SSP in a Mining and Iron Production Factory (MIPF). The DFSS was deployed through five distinct phases: DMAIC, for optimizing the current MIPF as a first part of the research. The second part of the research investigates the possibilities of developing the deliverables of the DMAIC for a DMADV for implementing a new MIPF. Use of the OPS in all phases of the DMAIC has provided highly effective and accurate prediction for factory process improvement. Furthermore, the paper explored the effective possibilities of developing the deliverables of the DMAIC for the DMADV for building new MIPF.", "subitem_description_language": "en", "subitem_description_type": "Abstract"}]}, "item_10_identifier_60": {"attribute_name": "URI", "attribute_value_mlt": [{"subitem_identifier_type": "DOI", "subitem_identifier_uri": "http://dx.doi.org/10.1109/WSC.2008.4736351"}, {"subitem_identifier_type": "HDL", "subitem_identifier_uri": "http://hdl.handle.net/2237/12109"}]}, "item_10_publisher_32": {"attribute_name": "出版者", "attribute_value_mlt": [{"subitem_publisher": "IEEE", "subitem_publisher_language": "en"}]}, "item_10_relation_11": {"attribute_name": "DOI", "attribute_value_mlt": [{"subitem_relation_type": "isVersionOf", "subitem_relation_type_id": {"subitem_relation_type_id_text": "https://doi.org/10.1109/WSC.2008.4736351", "subitem_relation_type_select": "DOI"}}]}, "item_10_rights_12": {"attribute_name": "権利", "attribute_value_mlt": [{"subitem_rights": "Copyright © 2008 IEEE. Reprinted from Winter Simulation Conference, 2008. WSC 2008. p.2431-2438. This material is posted here with permission of the IEEE. Such permission of the IEEE does not in any way imply IEEE endorsement of any of Nagoya University’s products or services. Internal or personal use of this material is permitted. However, permission to reprint/republish this material for advertising or promotional purposes or for creating new collective works for resale or redistribution must be obtained from the IEEE by writing to pubs-permissions@ieee.org.", "subitem_rights_language": "en"}]}, "item_10_select_15": {"attribute_name": "著者版フラグ", "attribute_value_mlt": [{"subitem_select_item": "publisher"}]}, "item_10_text_14": {"attribute_name": "フォーマット", "attribute_value_mlt": [{"subitem_text_value": "application/pdf"}]}, "item_1615787544753": {"attribute_name": "出版タイプ", "attribute_value_mlt": [{"subitem_version_resource": "http://purl.org/coar/version/c_970fb48d4fbd8a85", "subitem_version_type": "VoR"}]}, "item_access_right": {"attribute_name": "アクセス権", "attribute_value_mlt": [{"subitem_access_right": "open access", "subitem_access_right_uri": "http://purl.org/coar/access_right/c_abf2"}]}, "item_creator": {"attribute_name": "著者", "attribute_type": "creator", "attribute_value_mlt": [{"creatorNames": [{"creatorName": "Chinbat, Undram", "creatorNameLang": "en"}], "nameIdentifiers": [{"nameIdentifier": "31200", "nameIdentifierScheme": "WEKO"}]}, {"creatorNames": [{"creatorName": "Takakuwa, Soemon", "creatorNameLang": "en"}], "nameIdentifiers": [{"nameIdentifier": "31201", "nameIdentifierScheme": "WEKO"}]}]}, "item_files": {"attribute_name": "ファイル情報", "attribute_type": "file", "attribute_value_mlt": [{"accessrole": "open_date", "date": [{"dateType": "Available", "dateValue": "2018-02-20"}], "displaytype": "detail", "download_preview_message": "", "file_order": 0, "filename": "304Chinbat_Takakuwa_WSC2008.pdf", "filesize": [{"value": "849.3 kB"}], "format": "application/pdf", "future_date_message": "", "is_thumbnail": false, "licensetype": "license_note", "mimetype": "application/pdf", "size": 849300.0, "url": {"label": "304Chinbat_Takakuwa_WSC2008.pdf", "objectType": "fulltext", "url": "https://nagoya.repo.nii.ac.jp/record/10289/files/304Chinbat_Takakuwa_WSC2008.pdf"}, "version_id": "b36c3d9c-7ba0-4a10-8fea-5475c21e5571"}]}, "item_language": {"attribute_name": "言語", "attribute_value_mlt": [{"subitem_language": "eng"}]}, "item_resource_type": {"attribute_name": "資源タイプ", "attribute_value_mlt": [{"resourcetype": "journal article", "resourceuri": "http://purl.org/coar/resource_type/c_6501"}]}, "item_title": "USING OPERATION PROCESS SIMULATION FOR A SIX SIGMA PROJECT OF MINING AND IRON PRODUCTION FACTORY", "item_titles": {"attribute_name": "タイトル", "attribute_value_mlt": [{"subitem_title": "USING OPERATION PROCESS SIMULATION FOR A SIX SIGMA PROJECT OF MINING AND IRON PRODUCTION FACTORY", "subitem_title_language": "en"}]}, "item_type_id": "10", "owner": "1", "path": ["1126"], "permalink_uri": "http://hdl.handle.net/2237/12109", "pubdate": {"attribute_name": "PubDate", "attribute_value": "2009-08-27"}, "publish_date": "2009-08-27", "publish_status": "0", "recid": "10289", "relation": {}, "relation_version_is_last": true, "title": ["USING OPERATION PROCESS SIMULATION FOR A SIX SIGMA PROJECT OF MINING AND IRON PRODUCTION FACTORY"], "weko_shared_id": -1}
  1. A400 経済学部/経済学研究科
  2. A400e 会議資料
  3. 国際会議

USING OPERATION PROCESS SIMULATION FOR A SIX SIGMA PROJECT OF MINING AND IRON PRODUCTION FACTORY

http://hdl.handle.net/2237/12109
http://hdl.handle.net/2237/12109
bb9c4880-8968-43d2-8d9f-9c3ee86b8cd3
名前 / ファイル ライセンス アクション
304Chinbat_Takakuwa_WSC2008.pdf 304Chinbat_Takakuwa_WSC2008.pdf (849.3 kB)
Item type 学術雑誌論文 / Journal Article(1)
公開日 2009-08-27
タイトル
タイトル USING OPERATION PROCESS SIMULATION FOR A SIX SIGMA PROJECT OF MINING AND IRON PRODUCTION FACTORY
言語 en
著者 Chinbat, Undram

× Chinbat, Undram

WEKO 31200

en Chinbat, Undram

Search repository
Takakuwa, Soemon

× Takakuwa, Soemon

WEKO 31201

en Takakuwa, Soemon

Search repository
アクセス権
アクセス権 open access
アクセス権URI http://purl.org/coar/access_right/c_abf2
権利
言語 en
権利情報 Copyright © 2008 IEEE. Reprinted from Winter Simulation Conference, 2008. WSC 2008. p.2431-2438. This material is posted here with permission of the IEEE. Such permission of the IEEE does not in any way imply IEEE endorsement of any of Nagoya University’s products or services. Internal or personal use of this material is permitted. However, permission to reprint/republish this material for advertising or promotional purposes or for creating new collective works for resale or redistribution must be obtained from the IEEE by writing to pubs-permissions@ieee.org.
抄録
内容記述 The use of the Operation Process Simulation (OPS) for Six Sigma Projects (SSP) can illustrate visual display of the process by enabling to define, measure, analyze and improve the current process virtually but realistically. This paper investigates the quantitative benefits of using the Design for Six Sigma (DFSS) technique for a SSP in a Mining and Iron Production Factory (MIPF). The DFSS was deployed through five distinct phases: DMAIC, for optimizing the current MIPF as a first part of the research. The second part of the research investigates the possibilities of developing the deliverables of the DMAIC for a DMADV for implementing a new MIPF. Use of the OPS in all phases of the DMAIC has provided highly effective and accurate prediction for factory process improvement. Furthermore, the paper explored the effective possibilities of developing the deliverables of the DMAIC for the DMADV for building new MIPF.
言語 en
内容記述タイプ Abstract
出版者
言語 en
出版者 IEEE
言語
言語 eng
資源タイプ
資源タイプresource http://purl.org/coar/resource_type/c_6501
タイプ journal article
出版タイプ
出版タイプ VoR
出版タイプResource http://purl.org/coar/version/c_970fb48d4fbd8a85
DOI
関連タイプ isVersionOf
識別子タイプ DOI
関連識別子 https://doi.org/10.1109/WSC.2008.4736351
書誌情報 en : Winter Simulation Conference (WSC 2008)

p. 2431-2438, 発行日 2008-12
フォーマット
application/pdf
著者版フラグ
値 publisher
URI
識別子 http://dx.doi.org/10.1109/WSC.2008.4736351
識別子タイプ DOI
URI
識別子 http://hdl.handle.net/2237/12109
識別子タイプ HDL
戻る
0
views
See details
Views

Versions

Ver.1 2021-03-01 19:31:58.961529
Show All versions

Share

Mendeley Twitter Facebook Print Addthis

Cite as

エクスポート

OAI-PMH
  • OAI-PMH JPCOAR
  • OAI-PMH DublinCore
  • OAI-PMH DDI
Other Formats
  • JSON
  • BIBTEX

Confirm


Powered by WEKO3


Powered by WEKO3