{"created":"2021-03-01T06:11:51.775024+00:00","id":5306,"links":{},"metadata":{"_buckets":{"deposit":"6ad3923e-9d40-427c-9676-eff8efefab36"},"_deposit":{"id":"5306","owners":[],"pid":{"revision_id":0,"type":"depid","value":"5306"},"status":"published"},"_oai":{"id":"oai:nagoya.repo.nii.ac.jp:00005306","sets":["320:321:322"]},"author_link":["13482","13483","13484"],"item_10_biblio_info_6":{"attribute_name":"書誌情報","attribute_value_mlt":[{"bibliographicIssueDates":{"bibliographicIssueDate":"1994-11","bibliographicIssueDateType":"Issued"},"bibliographicPageEnd":"83","bibliographicPageStart":"78","bibliographic_titles":[{"bibliographic_title":"Proceedings of the Eighteenth Annual International Computer Software and Applications Conference","bibliographic_titleLang":"en"}]}]},"item_10_description_4":{"attribute_name":"抄録","attribute_value_mlt":[{"subitem_description":"In this paper, we propose a framework to manage interrelated tasks concurrently and successively, and address the issue about event handling and task scheduling: the event handler organizes interrelated tasks from a static point of view, and the task scheduler controls them on the basis of the dynamic behavior properties. In order to design our flexible control mechanism, we introduce the state transition graph and AND-OR graph in the event handler, whereas in the task scheduler the timestamp ordering method is applied to. Additionally, we describe the failure handling, concerning the cooperation between the event handler and task scheduler.","subitem_description_language":"en","subitem_description_type":"Abstract"}]},"item_10_identifier_60":{"attribute_name":"URI","attribute_value_mlt":[{"subitem_identifier_type":"HDL","subitem_identifier_uri":"http://hdl.handle.net/2237/6899"}]},"item_10_publisher_32":{"attribute_name":"出版者","attribute_value_mlt":[{"subitem_publisher":"IEEE","subitem_publisher_language":"en"}]},"item_10_relation_11":{"attribute_name":"DOI","attribute_value_mlt":[{"subitem_relation_type":"isVersionOf","subitem_relation_type_id":{"subitem_relation_type_id_text":"https://doi.org/10.1109/CMPSAC.1994.342828","subitem_relation_type_select":"DOI"}}]},"item_10_rights_12":{"attribute_name":"権利","attribute_value_mlt":[{"subitem_rights":"Copyright © 1994 IEEE. Reprinted from (relevant publication info). This material is posted here with permission of the IEEE. Such permission of the IEEE does not in any way imply IEEE endorsement of any of Nagoya University’s products or services. Internal or personal use of this material is permitted. However, permission to reprint/republish this material for advertising or promotional purposes or for creating new collective works for resale or redistribution must be obtained from the IEEE by writing to pubs-permissions@ieee.org.","subitem_rights_language":"en"}]},"item_10_select_15":{"attribute_name":"著者版フラグ","attribute_value_mlt":[{"subitem_select_item":"publisher"}]},"item_10_text_14":{"attribute_name":"フォーマット","attribute_value_mlt":[{"subitem_text_value":"application/pdf"}]},"item_1615787544753":{"attribute_name":"出版タイプ","attribute_value_mlt":[{"subitem_version_resource":"http://purl.org/coar/version/c_970fb48d4fbd8a85","subitem_version_type":"VoR"}]},"item_access_right":{"attribute_name":"アクセス権","attribute_value_mlt":[{"subitem_access_right":"open access","subitem_access_right_uri":"http://purl.org/coar/access_right/c_abf2"}]},"item_creator":{"attribute_name":"著者","attribute_type":"creator","attribute_value_mlt":[{"creatorNames":[{"creatorName":"Watanabe, Hiroyuki","creatorNameLang":"en"}],"nameIdentifiers":[{"nameIdentifier":"13482","nameIdentifierScheme":"WEKO"}]},{"creatorNames":[{"creatorName":"Watanabe, Toyohide","creatorNameLang":"en"}],"nameIdentifiers":[{"nameIdentifier":"13483","nameIdentifierScheme":"WEKO"}]},{"creatorNames":[{"creatorName":"Sugie, Noboru","creatorNameLang":"en"}],"nameIdentifiers":[{"nameIdentifier":"13484","nameIdentifierScheme":"WEKO"}]}]},"item_files":{"attribute_name":"ファイル情報","attribute_type":"file","attribute_value_mlt":[{"accessrole":"open_date","date":[{"dateType":"Available","dateValue":"2018-02-19"}],"displaytype":"detail","filename":"COMPSAC_94_78.pdf","filesize":[{"value":"1.2 MB"}],"format":"application/pdf","licensetype":"license_note","mimetype":"application/pdf","url":{"label":"COMPSAC_94_78.pdf","objectType":"fulltext","url":"https://nagoya.repo.nii.ac.jp/record/5306/files/COMPSAC_94_78.pdf"},"version_id":"4929ff33-73f3-40bd-bc5b-883e69cdd8e6"}]},"item_language":{"attribute_name":"言語","attribute_value_mlt":[{"subitem_language":"eng"}]},"item_resource_type":{"attribute_name":"資源タイプ","attribute_value_mlt":[{"resourcetype":"journal article","resourceuri":"http://purl.org/coar/resource_type/c_6501"}]},"item_title":"A flexible control mechanism for managing interrelated/interdependent tasks successively","item_titles":{"attribute_name":"タイトル","attribute_value_mlt":[{"subitem_title":"A flexible control mechanism for managing interrelated/interdependent tasks successively","subitem_title_language":"en"}]},"item_type_id":"10","owner":"1","path":["322"],"pubdate":{"attribute_name":"PubDate","attribute_value":"2006-09-08"},"publish_date":"2006-09-08","publish_status":"0","recid":"5306","relation_version_is_last":true,"title":["A flexible control mechanism for managing interrelated/interdependent tasks successively"],"weko_creator_id":"1","weko_shared_id":-1},"updated":"2023-01-16T03:49:52.644577+00:00"}