ログイン
言語:

WEKO3

  • トップ
  • ランキング
To
lat lon distance
To

Field does not validate



インデックスリンク

インデックスツリー

メールアドレスを入力してください。

WEKO

One fine body…

WEKO

One fine body…

アイテム

{"_buckets": {"deposit": "6628084d-280b-460a-b4b6-aff00e27f91d"}, "_deposit": {"id": "12649", "owners": [], "pid": {"revision_id": 0, "type": "depid", "value": "12649"}, "status": "published"}, "_oai": {"id": "oai:nagoya.repo.nii.ac.jp:00012649", "sets": ["503"]}, "author_link": ["39787", "39788", "39789", "39790", "39791"], "item_10_biblio_info_6": {"attribute_name": "書誌情報", "attribute_value_mlt": [{"bibliographicIssueDates": {"bibliographicIssueDate": "2010-06-06", "bibliographicIssueDateType": "Issued"}, "bibliographicPageEnd": "5", "bibliographicPageStart": "1", "bibliographic_titles": [{"bibliographic_title": "Electrical Insulation (ISEI), Conference Record of the 2010 IEEE International Symposium on", "bibliographic_titleLang": "en"}]}]}, "item_10_description_4": {"attribute_name": "抄録", "attribute_value_mlt": [{"subitem_description": "This paper presents a new optimization approach of maintenance strategy for equipment in a transmission and distribution (T\u0026D) system. In this approach, a present and future equipment performance is estimated by using monitoring data, and impacts of performance in each equipment on a whole T\u0026D system are evaluated. By minimizing the impacts, suitable maintenance procedures and timing are derived. This approach is applied to a circuit breaker (CB) in an electric network, and its significance and usefulness are presented.", "subitem_description_language": "en", "subitem_description_type": "Abstract"}]}, "item_10_identifier_60": {"attribute_name": "URI", "attribute_value_mlt": [{"subitem_identifier_type": "DOI", "subitem_identifier_uri": "http://dx.doi.org/10.1109/ELINSL.2010.5549579"}, {"subitem_identifier_type": "HDL", "subitem_identifier_uri": "http://hdl.handle.net/2237/14536"}]}, "item_10_publisher_32": {"attribute_name": "出版者", "attribute_value_mlt": [{"subitem_publisher": "IEEE", "subitem_publisher_language": "en"}]}, "item_10_relation_11": {"attribute_name": "DOI", "attribute_value_mlt": [{"subitem_relation_type": "isVersionOf", "subitem_relation_type_id": {"subitem_relation_type_id_text": "https://doi.org/10.1109/ELINSL.2010.5549579", "subitem_relation_type_select": "DOI"}}]}, "item_10_relation_8": {"attribute_name": "ISBN", "attribute_value_mlt": [{"subitem_relation_type": "isPartOf", "subitem_relation_type_id": {"subitem_relation_type_id_text": "978-1-4244-6298-8", "subitem_relation_type_select": "ISBN"}}]}, "item_10_rights_12": {"attribute_name": "権利", "attribute_value_mlt": [{"subitem_rights": "© 2010 IEEE. Reprinted, with permission, from Yotaro Suzuki; Hiroki Kojima; Naoki Hayakawa; Fumihiro Endo; Hitoshi Okubo, Optimization of asset management in high voltage substation based on equipment monitoring and power system operation, Electrical Insulation (ISEI), Conference Record of the 2010 IEEE International Symposium, Jun/2010", "subitem_rights_language": "en"}]}, "item_10_select_15": {"attribute_name": "著者版フラグ", "attribute_value_mlt": [{"subitem_select_item": "author"}]}, "item_10_source_id_7": {"attribute_name": "ISSN", "attribute_value_mlt": [{"subitem_source_identifier": "1089-084X", "subitem_source_identifier_type": "PISSN"}]}, "item_1615787544753": {"attribute_name": "出版タイプ", "attribute_value_mlt": [{"subitem_version_resource": "http://purl.org/coar/version/c_ab4af688f83e57aa", "subitem_version_type": "AM"}]}, "item_access_right": {"attribute_name": "アクセス権", "attribute_value_mlt": [{"subitem_access_right": "open access", "subitem_access_right_uri": "http://purl.org/coar/access_right/c_abf2"}]}, "item_creator": {"attribute_name": "著者", "attribute_type": "creator", "attribute_value_mlt": [{"creatorNames": [{"creatorName": "Suzuki, Yotaro", "creatorNameLang": "en"}], "nameIdentifiers": [{"nameIdentifier": "39787", "nameIdentifierScheme": "WEKO"}]}, {"creatorNames": [{"creatorName": "Kojima, Hiroki", "creatorNameLang": "en"}], "nameIdentifiers": [{"nameIdentifier": "39788", "nameIdentifierScheme": "WEKO"}]}, {"creatorNames": [{"creatorName": "Hayakawa, Naoki", "creatorNameLang": "en"}], "nameIdentifiers": [{"nameIdentifier": "39789", "nameIdentifierScheme": "WEKO"}]}, {"creatorNames": [{"creatorName": "Endo, Fumihiro", "creatorNameLang": "en"}], "nameIdentifiers": [{"nameIdentifier": "39790", "nameIdentifierScheme": "WEKO"}]}, {"creatorNames": [{"creatorName": "Okubo, Hitoshi", "creatorNameLang": "en"}], "nameIdentifiers": [{"nameIdentifier": "39791", "nameIdentifierScheme": "WEKO"}]}]}, "item_files": {"attribute_name": "ファイル情報", "attribute_type": "file", "attribute_value_mlt": [{"accessrole": "open_date", "date": [{"dateType": "Available", "dateValue": "2018-02-20"}], "displaytype": "detail", "download_preview_message": "", "file_order": 0, "filename": "1105.pdf", "filesize": [{"value": "369.2 kB"}], "format": "application/pdf", "future_date_message": "", "is_thumbnail": false, "licensetype": "license_note", "mimetype": "application/pdf", "size": 369200.0, "url": {"label": "1105.pdf", "objectType": "fulltext", "url": "https://nagoya.repo.nii.ac.jp/record/12649/files/1105.pdf"}, "version_id": "7d4c28d6-08a4-4311-b6bc-7523ea34550f"}]}, "item_keyword": {"attribute_name": "キーワード", "attribute_value_mlt": [{"subitem_subject": "Asset Management", "subitem_subject_scheme": "Other"}, {"subitem_subject": "Diagnosis", "subitem_subject_scheme": "Other"}, {"subitem_subject": "Circuit Breaker", "subitem_subject_scheme": "Other"}, {"subitem_subject": "Substation", "subitem_subject_scheme": "Other"}, {"subitem_subject": "Electric Power System", "subitem_subject_scheme": "Other"}, {"subitem_subject": "Maintenance", "subitem_subject_scheme": "Other"}]}, "item_language": {"attribute_name": "言語", "attribute_value_mlt": [{"subitem_language": "eng"}]}, "item_resource_type": {"attribute_name": "資源タイプ", "attribute_value_mlt": [{"resourcetype": "journal article", "resourceuri": "http://purl.org/coar/resource_type/c_6501"}]}, "item_title": "Optimization of Asset Management in High Voltage Substation Based on Equipment Monitoring and Power System Operation", "item_titles": {"attribute_name": "タイトル", "attribute_value_mlt": [{"subitem_title": "Optimization of Asset Management in High Voltage Substation Based on Equipment Monitoring and Power System Operation", "subitem_title_language": "en"}]}, "item_type_id": "10", "owner": "1", "path": ["503"], "permalink_uri": "http://hdl.handle.net/2237/14536", "pubdate": {"attribute_name": "PubDate", "attribute_value": "2011-04-07"}, "publish_date": "2011-04-07", "publish_status": "0", "recid": "12649", "relation": {}, "relation_version_is_last": true, "title": ["Optimization of Asset Management in High Voltage Substation Based on Equipment Monitoring and Power System Operation"], "weko_shared_id": -1}
  1. B200 工学部/工学研究科
  2. B200e 会議資料
  3. 国際会議

Optimization of Asset Management in High Voltage Substation Based on Equipment Monitoring and Power System Operation

http://hdl.handle.net/2237/14536
http://hdl.handle.net/2237/14536
512ade93-6331-4760-9276-08a0e1ff5d49
名前 / ファイル ライセンス アクション
1105.pdf 1105.pdf (369.2 kB)
Item type 学術雑誌論文 / Journal Article(1)
公開日 2011-04-07
タイトル
タイトル Optimization of Asset Management in High Voltage Substation Based on Equipment Monitoring and Power System Operation
言語 en
著者 Suzuki, Yotaro

× Suzuki, Yotaro

WEKO 39787

en Suzuki, Yotaro

Search repository
Kojima, Hiroki

× Kojima, Hiroki

WEKO 39788

en Kojima, Hiroki

Search repository
Hayakawa, Naoki

× Hayakawa, Naoki

WEKO 39789

en Hayakawa, Naoki

Search repository
Endo, Fumihiro

× Endo, Fumihiro

WEKO 39790

en Endo, Fumihiro

Search repository
Okubo, Hitoshi

× Okubo, Hitoshi

WEKO 39791

en Okubo, Hitoshi

Search repository
アクセス権
アクセス権 open access
アクセス権URI http://purl.org/coar/access_right/c_abf2
権利
言語 en
権利情報 © 2010 IEEE. Reprinted, with permission, from Yotaro Suzuki; Hiroki Kojima; Naoki Hayakawa; Fumihiro Endo; Hitoshi Okubo, Optimization of asset management in high voltage substation based on equipment monitoring and power system operation, Electrical Insulation (ISEI), Conference Record of the 2010 IEEE International Symposium, Jun/2010
キーワード
主題Scheme Other
主題 Asset Management
キーワード
主題Scheme Other
主題 Diagnosis
キーワード
主題Scheme Other
主題 Circuit Breaker
キーワード
主題Scheme Other
主題 Substation
キーワード
主題Scheme Other
主題 Electric Power System
キーワード
主題Scheme Other
主題 Maintenance
抄録
内容記述 This paper presents a new optimization approach of maintenance strategy for equipment in a transmission and distribution (T&D) system. In this approach, a present and future equipment performance is estimated by using monitoring data, and impacts of performance in each equipment on a whole T&D system are evaluated. By minimizing the impacts, suitable maintenance procedures and timing are derived. This approach is applied to a circuit breaker (CB) in an electric network, and its significance and usefulness are presented.
言語 en
内容記述タイプ Abstract
出版者
言語 en
出版者 IEEE
言語
言語 eng
資源タイプ
資源タイプresource http://purl.org/coar/resource_type/c_6501
タイプ journal article
出版タイプ
出版タイプ AM
出版タイプResource http://purl.org/coar/version/c_ab4af688f83e57aa
DOI
関連タイプ isVersionOf
識別子タイプ DOI
関連識別子 https://doi.org/10.1109/ELINSL.2010.5549579
ISBN
関連タイプ isPartOf
識別子タイプ ISBN
関連識別子 978-1-4244-6298-8
ISSN
収録物識別子タイプ PISSN
収録物識別子 1089-084X
書誌情報 en : Electrical Insulation (ISEI), Conference Record of the 2010 IEEE International Symposium on

p. 1-5, 発行日 2010-06-06
著者版フラグ
値 author
URI
識別子 http://dx.doi.org/10.1109/ELINSL.2010.5549579
識別子タイプ DOI
URI
識別子 http://hdl.handle.net/2237/14536
識別子タイプ HDL
戻る
0
views
See details
Views

Versions

Ver.1 2021-03-01 18:49:04.595419
Show All versions

Share

Mendeley Twitter Facebook Print Addthis

Cite as

エクスポート

OAI-PMH
  • OAI-PMH JPCOAR
  • OAI-PMH DublinCore
  • OAI-PMH DDI
Other Formats
  • JSON
  • BIBTEX

Confirm


Powered by WEKO3


Powered by WEKO3