WEKO3
アイテム
{"_buckets": {"deposit": "6628084d-280b-460a-b4b6-aff00e27f91d"}, "_deposit": {"id": "12649", "owners": [], "pid": {"revision_id": 0, "type": "depid", "value": "12649"}, "status": "published"}, "_oai": {"id": "oai:nagoya.repo.nii.ac.jp:00012649", "sets": ["503"]}, "author_link": ["39787", "39788", "39789", "39790", "39791"], "item_10_biblio_info_6": {"attribute_name": "書誌情報", "attribute_value_mlt": [{"bibliographicIssueDates": {"bibliographicIssueDate": "2010-06-06", "bibliographicIssueDateType": "Issued"}, "bibliographicPageEnd": "5", "bibliographicPageStart": "1", "bibliographic_titles": [{"bibliographic_title": "Electrical Insulation (ISEI), Conference Record of the 2010 IEEE International Symposium on", "bibliographic_titleLang": "en"}]}]}, "item_10_description_4": {"attribute_name": "抄録", "attribute_value_mlt": [{"subitem_description": "This paper presents a new optimization approach of maintenance strategy for equipment in a transmission and distribution (T\u0026D) system. In this approach, a present and future equipment performance is estimated by using monitoring data, and impacts of performance in each equipment on a whole T\u0026D system are evaluated. By minimizing the impacts, suitable maintenance procedures and timing are derived. This approach is applied to a circuit breaker (CB) in an electric network, and its significance and usefulness are presented.", "subitem_description_language": "en", "subitem_description_type": "Abstract"}]}, "item_10_identifier_60": {"attribute_name": "URI", "attribute_value_mlt": [{"subitem_identifier_type": "DOI", "subitem_identifier_uri": "http://dx.doi.org/10.1109/ELINSL.2010.5549579"}, {"subitem_identifier_type": "HDL", "subitem_identifier_uri": "http://hdl.handle.net/2237/14536"}]}, "item_10_publisher_32": {"attribute_name": "出版者", "attribute_value_mlt": [{"subitem_publisher": "IEEE", "subitem_publisher_language": "en"}]}, "item_10_relation_11": {"attribute_name": "DOI", "attribute_value_mlt": [{"subitem_relation_type": "isVersionOf", "subitem_relation_type_id": {"subitem_relation_type_id_text": "https://doi.org/10.1109/ELINSL.2010.5549579", "subitem_relation_type_select": "DOI"}}]}, "item_10_relation_8": {"attribute_name": "ISBN", "attribute_value_mlt": [{"subitem_relation_type": "isPartOf", "subitem_relation_type_id": {"subitem_relation_type_id_text": "978-1-4244-6298-8", "subitem_relation_type_select": "ISBN"}}]}, "item_10_rights_12": {"attribute_name": "権利", "attribute_value_mlt": [{"subitem_rights": "© 2010 IEEE. Reprinted, with permission, from Yotaro Suzuki; Hiroki Kojima; Naoki Hayakawa; Fumihiro Endo; Hitoshi Okubo, Optimization of asset management in high voltage substation based on equipment monitoring and power system operation, Electrical Insulation (ISEI), Conference Record of the 2010 IEEE International Symposium, Jun/2010", "subitem_rights_language": "en"}]}, "item_10_select_15": {"attribute_name": "著者版フラグ", "attribute_value_mlt": [{"subitem_select_item": "author"}]}, "item_10_source_id_7": {"attribute_name": "ISSN", "attribute_value_mlt": [{"subitem_source_identifier": "1089-084X", "subitem_source_identifier_type": "PISSN"}]}, "item_1615787544753": {"attribute_name": "出版タイプ", "attribute_value_mlt": [{"subitem_version_resource": "http://purl.org/coar/version/c_ab4af688f83e57aa", "subitem_version_type": "AM"}]}, "item_access_right": {"attribute_name": "アクセス権", "attribute_value_mlt": [{"subitem_access_right": "open access", "subitem_access_right_uri": "http://purl.org/coar/access_right/c_abf2"}]}, "item_creator": {"attribute_name": "著者", "attribute_type": "creator", "attribute_value_mlt": [{"creatorNames": [{"creatorName": "Suzuki, Yotaro", "creatorNameLang": "en"}], "nameIdentifiers": [{"nameIdentifier": "39787", "nameIdentifierScheme": "WEKO"}]}, {"creatorNames": [{"creatorName": "Kojima, Hiroki", "creatorNameLang": "en"}], "nameIdentifiers": [{"nameIdentifier": "39788", "nameIdentifierScheme": "WEKO"}]}, {"creatorNames": [{"creatorName": "Hayakawa, Naoki", "creatorNameLang": "en"}], "nameIdentifiers": [{"nameIdentifier": "39789", "nameIdentifierScheme": "WEKO"}]}, {"creatorNames": [{"creatorName": "Endo, Fumihiro", "creatorNameLang": "en"}], "nameIdentifiers": [{"nameIdentifier": "39790", "nameIdentifierScheme": "WEKO"}]}, {"creatorNames": [{"creatorName": "Okubo, Hitoshi", "creatorNameLang": "en"}], "nameIdentifiers": [{"nameIdentifier": "39791", "nameIdentifierScheme": "WEKO"}]}]}, "item_files": {"attribute_name": "ファイル情報", "attribute_type": "file", "attribute_value_mlt": [{"accessrole": "open_date", "date": [{"dateType": "Available", "dateValue": "2018-02-20"}], "displaytype": "detail", "download_preview_message": "", "file_order": 0, "filename": "1105.pdf", "filesize": [{"value": "369.2 kB"}], "format": "application/pdf", "future_date_message": "", "is_thumbnail": false, "licensetype": "license_note", "mimetype": "application/pdf", "size": 369200.0, "url": {"label": "1105.pdf", "objectType": "fulltext", "url": "https://nagoya.repo.nii.ac.jp/record/12649/files/1105.pdf"}, "version_id": "7d4c28d6-08a4-4311-b6bc-7523ea34550f"}]}, "item_keyword": {"attribute_name": "キーワード", "attribute_value_mlt": [{"subitem_subject": "Asset Management", "subitem_subject_scheme": "Other"}, {"subitem_subject": "Diagnosis", "subitem_subject_scheme": "Other"}, {"subitem_subject": "Circuit Breaker", "subitem_subject_scheme": "Other"}, {"subitem_subject": "Substation", "subitem_subject_scheme": "Other"}, {"subitem_subject": "Electric Power System", "subitem_subject_scheme": "Other"}, {"subitem_subject": "Maintenance", "subitem_subject_scheme": "Other"}]}, "item_language": {"attribute_name": "言語", "attribute_value_mlt": [{"subitem_language": "eng"}]}, "item_resource_type": {"attribute_name": "資源タイプ", "attribute_value_mlt": [{"resourcetype": "journal article", "resourceuri": "http://purl.org/coar/resource_type/c_6501"}]}, "item_title": "Optimization of Asset Management in High Voltage Substation Based on Equipment Monitoring and Power System Operation", "item_titles": {"attribute_name": "タイトル", "attribute_value_mlt": [{"subitem_title": "Optimization of Asset Management in High Voltage Substation Based on Equipment Monitoring and Power System Operation", "subitem_title_language": "en"}]}, "item_type_id": "10", "owner": "1", "path": ["503"], "permalink_uri": "http://hdl.handle.net/2237/14536", "pubdate": {"attribute_name": "PubDate", "attribute_value": "2011-04-07"}, "publish_date": "2011-04-07", "publish_status": "0", "recid": "12649", "relation": {}, "relation_version_is_last": true, "title": ["Optimization of Asset Management in High Voltage Substation Based on Equipment Monitoring and Power System Operation"], "weko_shared_id": -1}
Optimization of Asset Management in High Voltage Substation Based on Equipment Monitoring and Power System Operation
http://hdl.handle.net/2237/14536
http://hdl.handle.net/2237/14536512ade93-6331-4760-9276-08a0e1ff5d49
名前 / ファイル | ライセンス | アクション |
---|---|---|
![]() |
|
Item type | 学術雑誌論文 / Journal Article(1) | |||||
---|---|---|---|---|---|---|
公開日 | 2011-04-07 | |||||
タイトル | ||||||
タイトル | Optimization of Asset Management in High Voltage Substation Based on Equipment Monitoring and Power System Operation | |||||
言語 | en | |||||
著者 |
Suzuki, Yotaro
× Suzuki, Yotaro× Kojima, Hiroki× Hayakawa, Naoki× Endo, Fumihiro× Okubo, Hitoshi |
|||||
アクセス権 | ||||||
アクセス権 | open access | |||||
アクセス権URI | http://purl.org/coar/access_right/c_abf2 | |||||
権利 | ||||||
言語 | en | |||||
権利情報 | © 2010 IEEE. Reprinted, with permission, from Yotaro Suzuki; Hiroki Kojima; Naoki Hayakawa; Fumihiro Endo; Hitoshi Okubo, Optimization of asset management in high voltage substation based on equipment monitoring and power system operation, Electrical Insulation (ISEI), Conference Record of the 2010 IEEE International Symposium, Jun/2010 | |||||
キーワード | ||||||
主題Scheme | Other | |||||
主題 | Asset Management | |||||
キーワード | ||||||
主題Scheme | Other | |||||
主題 | Diagnosis | |||||
キーワード | ||||||
主題Scheme | Other | |||||
主題 | Circuit Breaker | |||||
キーワード | ||||||
主題Scheme | Other | |||||
主題 | Substation | |||||
キーワード | ||||||
主題Scheme | Other | |||||
主題 | Electric Power System | |||||
キーワード | ||||||
主題Scheme | Other | |||||
主題 | Maintenance | |||||
抄録 | ||||||
内容記述 | This paper presents a new optimization approach of maintenance strategy for equipment in a transmission and distribution (T&D) system. In this approach, a present and future equipment performance is estimated by using monitoring data, and impacts of performance in each equipment on a whole T&D system are evaluated. By minimizing the impacts, suitable maintenance procedures and timing are derived. This approach is applied to a circuit breaker (CB) in an electric network, and its significance and usefulness are presented. | |||||
言語 | en | |||||
内容記述タイプ | Abstract | |||||
出版者 | ||||||
言語 | en | |||||
出版者 | IEEE | |||||
言語 | ||||||
言語 | eng | |||||
資源タイプ | ||||||
資源タイプresource | http://purl.org/coar/resource_type/c_6501 | |||||
タイプ | journal article | |||||
出版タイプ | ||||||
出版タイプ | AM | |||||
出版タイプResource | http://purl.org/coar/version/c_ab4af688f83e57aa | |||||
DOI | ||||||
関連タイプ | isVersionOf | |||||
識別子タイプ | DOI | |||||
関連識別子 | https://doi.org/10.1109/ELINSL.2010.5549579 | |||||
ISBN | ||||||
関連タイプ | isPartOf | |||||
識別子タイプ | ISBN | |||||
関連識別子 | 978-1-4244-6298-8 | |||||
ISSN | ||||||
収録物識別子タイプ | PISSN | |||||
収録物識別子 | 1089-084X | |||||
書誌情報 |
en : Electrical Insulation (ISEI), Conference Record of the 2010 IEEE International Symposium on p. 1-5, 発行日 2010-06-06 |
|||||
著者版フラグ | ||||||
値 | author | |||||
URI | ||||||
識別子 | http://dx.doi.org/10.1109/ELINSL.2010.5549579 | |||||
識別子タイプ | DOI | |||||
URI | ||||||
識別子 | http://hdl.handle.net/2237/14536 | |||||
識別子タイプ | HDL |